PROJECT MANAGEMENT
You can count on us to bring your design to reality. We will create a clear project management plan and ensure that you are kept informed about your project at each stage of the process. You will benefit from expert guidance and support in every aspect and we will do so collaboratively with the promise that you will always be able to speak to our technical team whatever your enquiry. |
|
|
1. Initial contact (NDA, file types, brief discussion etc)
Signing a Non Disclosure Agreement (NDA) is fairly common practice and we are happy to sign an agreement. You can send your standard NDA to us and we can sign and start the process to provide you with access to a ‘no-obligation’ audit and quote for your part, so it costs nothing to discover whether or not injection moulding is suited to your application.
2. Quote, Technical Advice (tender to approved suppliers - tooling/relationship)
3. Tooling Order - Project Launch, Assign Project Manager, Initial Project Plan |
4. DFM (Design for Manufacture) Review
We carry out a thorough review of the part for injection moulding to fully optimise every aspect for plastic injection moulding to include cost and time efficiencies, quality. It is at this stage that we will suggest recommendations and modifications that will improve the part for injection moulding manufacture. |
|
|
5. Tool Design Sign-Off (general assembly) |
|
|
6. Weekly updates during tool manufacture project plan reviewed and updated, issue weekly timing plans and progress images to ensure quoted lead times are achieved. |
|
|
7. Tool Trial Reviews (Trial Video, FAI report, Injection Parameter, etc)
Tool trials are carried out by design engineers to ensure that the capability and reliability, conduct a full tool design review to pass off the mould design before manufacture can proceed. |
|
|
|
8. Tool Shipping (if required / overseas)
Sea and air freight options offered where the tool has been made for overseas customers. On tool arrival, our toolroom maintenance team will de-crate, strip clean and fully inspect the mould before it goes into a press for trial on site.
9. Approval & Sign off
From simple visual confirmation and sample approval sign off to full PPAP (Production Part Approval Process) style approval we will work with you to fully approve your part to the level you require. At this stage the project is handed over to the production team for mass production. Full capacity for dimension ISIR reporting. Master retained samples held.
10. QA Specification
Part specific Quality plans produced for each part reflecting agreed quality levels at approval stage. Part specific production dimensional and first off checks assigned for each part.
11. Production Handover
At handover from approval to production parts are controlled, scheduled and manufactured using the company wide ERP system. Service contact assigned?
12. Continuous Improvement
We observe continuous improvement and best practices and will always look to advise of ways for streamlining work and reducing waste, cost and time.
13. To find out how we can help leave a message or book a call back |